Spot Limit OCO Bracket Clip Planner
Size the limit buy, invalidation stop, and one or two take-profit sells — see max base, USDT notional, dollars at risk, gross and net R:R, and a per-leg ticket table — then open Kinetix Trade (Spot) and place the bracket yourself.
| Leg | Side | Price | Base qty | USDT | Note |
|---|
Planning math only — not investment advice, not a profit guarantee, and not an order ticket. OCO behavior varies by venue; re-check live fees, min notional, and fills on Kinetix Trade before submitting.
How the bracket clip is figured
Fee rate f applies on the limit buy, stop exit, and each TP sell. Net risk per base is entry×(1+f) − stop×(1−f). In risk cap mode, max base = cap ÷ that unit risk. In quote budget mode, base = budget ÷ entry×(1+f); dollars at risk follow from the sized clip. Each TP sells bag × sell%; leftover runner = bag − TP1 − TP2. Weighted take-profit price drives gross R ((effTP − entry) ÷ (entry − stop)) and net R after fees on the sold portion.
Educational planning aid for Spot. Map the bracket here, then execute on Kinetix Trade when ready.